Free Download presentation on BHEL,Haridwar
Here you can download the PPT on BHEL,Haridwar for free just follow the link below to download.
Preview |
A BRIEF HISTORY
The wide network of BHEL's 14 manufacturing divisions,
9 service centers & 4 power Sector Regional centers & about 150 project
sites enables the service at competitive prices. Having attained ISO 9000
certification, BHEL is now embarking upon the Total Quality Management. The
company's inherent potential coupled with its strong performance over the
years, has resulted in it being chosen as one of the "Navratna" PSEs,
which are to be supported by the Government in their endeavor to become future
global players.
ABSTRACT
The per capita energy consumption
in any country is an index of the living standard of the people of that
country. Electric energy is an essential ingredient for the industrial and
all-round development of any country. The increasing use of electrical energy
in different fields of daily life has been primarily due to the availability of
a vast variety of electrical machinery for the purpose of generation and
utilization. It is a coveted form of energy, because it can be generated
centrally in bulk and transmitted over long distances without much difficulty.
This energy is obtained by conversion from fossil fuels (coal, oil, natural
gas), the nuclear and hydro sources. Heat energy dissipated from the burning of
fuels or nuclear fission is first converted to mechanical energy and then this
mechanical energy is converted into electrical energy via generators. In power
plants, these generators may be a hydro generator or a turbo generator,
depending on the plant requirements. India earned a total self dependence
in the manufacturing of these generators (along with other heavy electrical
equipments) when Bharat Heavy Electricals Limited (BHEL) was established during
the 1950’s. It has been estimated that almost 75% of the electricity produced
in our country involves the BHEL made equipments.
Turbo generators are the most
important part of any thermal power plant; they are the actual producers of the
electricity. The complete manufacturing process of these generators involves
many stages. One of the most important is the manufacturing of the stator
winding bars. These bars undergo a complete set of processes before they get
ready for the stator winding assembly and connections. The following report has
been made on the basis of the knowledge gained by us through a 45 days
vocational training at BHEL Haridwar. The report describes completely the manufacturing process of a 500 MW TG stator
bar in detail. A detailed introduction to synchronous generators, hydro and
turbo generators have been provided at the beginning for a clear understanding
of the project.
Click here to download :-
For presentation BHEL,Haridwar Follow the link below
For presentation BHEL,Bhopal Follow the link below
For presentation BHEL,Hyderabad Follow the link below
Got it thanks
ReplyDeletewounderful
ReplyDeleteThanks man
ReplyDeleteThis is what i was looking for , and its here with the other useful links thanks man .
ReplyDelete